BOZEMAN AREA IMPROVEMENTS/MAES

Construction of New Shop Building. The new shop building includes site work, bollards, concrete aprons and slopping slab with drain, wood framing, foam insulation in the walls, blown in insulation in the roof, metal siding and roofing, overhead doors, hollow metal doors and frames, electrical heaters and lights. Construction duration of 9 weeks.

(Click An Image To Enlarge)